Tuesday, April 14, 2015

POTENTIAL MAIN EXHIBIT

This is the work in progress for the layout of the main exhibit. My goal if to get the feeling of the scale, based on the cars and how much space they take in the building 

Circulation Map



Above is the main circulation map based on the core and the architectural stair location

Sunday, April 12, 2015

POTENTIAL FLOOR PLANS

After I made the horizontal cuts in the 3D model I was able to extract the floor layout. Now I am able to explore the spaces in detail which allows me to layout my program.   

3D MODEL PROGRESS



This is the progress of the 3D model, I made the horizontal cuts that would represent the floor spaces.